HSR Layout to Kempegowda Airport: Distance, Buses and Metro
How far Bengaluru's airport really is from each HSR Layout sector, the two road routes, which KIA airport bus to catch and the stop to walk to, what the toll and pickup rules cost, and when the Blue Line metro will finally get there.
Kempegowda International Airport is 42.5–45.2 km by road from HSR Layout, and 32.4–33.3 km in a straight line, depending on the sector. Two families of BMTC Vayu Vajra airport buses serve HSR Layout: KIA-7 and KIA-7A from BDA Complex, through the city centre, and the KIA-8 series from the Outer Ring Road stops. There is no metro to the airport from HSR Layout yet.
The airport sits in Devanahalli at the far north of Bengaluru, and HSR Layout is in the south-east, so every airport run from here crosses the whole city. Most guides quote a single distance. We measured it instead: from the centre of each of HSR Layout's seven sectors to Terminal 1, along the road and in a straight line. We also read BMTC's own route data to find which airport buses stop inside HSR Layout and how long each bus route actually is. This page belongs to our guide to commuting from HSR Layout.
How far is HSR Layout from Kempegowda airport?
About 43–45 km by road on the shortest route, from any part of HSR Layout. The straight-line distance is about 33 km. Sector 5, at the north-west corner, is the closest sector at 42.5 km by road; Sector 2, at the south-east corner, is the furthest at 45.2 km. The spread between sectors is under 3 km, so on an airport trip the sector you stay in barely matters.
| Starting point | Straight line to Terminal 1 | Shortest road route |
|---|---|---|
| Sector 1 | 32.4 km | 43.9 km |
| Sector 2 | 33.1 km | 45.2 km |
| Sector 3 | 33.3 km | 43.7 km |
| Sector 4 | 32.7 km | 43.2 km |
| Sector 5 | 32.5 km | 42.5 km |
| Sector 6 | 33.0 km | 43.6 km |
| Sector 7 | 33.3 km | 43.6 km |
| 20th Cross Rd, Sector 7 (HSR Stay) | 33.3 km | 43.7 km |
OpenStreetMap sector centres to the Terminal 1 building, measured 17 November 2026. Road figures are the router's shortest-time route with no traffic.
The figure of "45–50 km" that circulates for this trip fits the longer roads rather than the shortest one: the route through the city centre is 45.3 km from Sector 7. The airport buses that serve HSR Layout cover 48–56 km of road between an HSR Layout stop and the airport, because they go through the city centre or round the Outer Ring Road to pick up passengers.
Which road goes from HSR Layout to the airport?
There are two main ways: across the eastern side of the city to Hennur and up Hennur–Bagalur Road, or through the city centre and north on Bellary Road (NH 44) over the Hebbal flyover. From 20th Cross Rd in Sector 7, OSRM measured the two at almost the same length:
| Route from 20th Cross Rd | Road distance | Roads, in order |
|---|---|---|
| East: via Hennur–Bagalur Road | 43.7 km | 14th Main Road, 80 Feet Road, Srinivagilu Main Road, Lower Agaram Road, Assaye Road, 80 Feet Main Road, then Hennur–Bagalur Road to the airport |
| West: via the city centre and Bellary Road | 45.3 km | Outer Ring Road, Hosur Road, Lalbagh Fort Road, JC Road, Palace Road, Bellary Road (NH 44), the Hebbal flyover, the airport trumpet interchange |
With completely empty roads, OSRM estimates 46–48 minutes from any HSR Layout sector. Treat that as the floor, not a forecast: both routes cross central or north-east Bengaluru, and the time depends on the hour far more than on the kilometres. We publish no measured journey time for that reason.
The Bellary Road approach passes the Sadahalli toll plaza on the airport road. The toll section below has what it costs.
Which bus goes from HSR Layout to the airport?
Seven BMTC Vayu Vajra airport routes stop in or beside HSR Layout: KIA-7 and KIA-7A, which run through the city centre, and KIA-8, KIA-8A, KIA-8C, KIA-8E and KIA-8EW, which run along the Outer Ring Road. All are air-conditioned. Routes beginning "KIA-" are BMTC's airport buses, sold under the Vayu Vajra name.
| Route | Where it picks up in HSR Layout | Which way it goes | Bus route length to the airport | BMTC scheduled running time |
|---|---|---|---|---|
| KIA-7A | Starts at BDA Complex HSR Layout (Sector 6). One variant starts a stop earlier at Depot-25 Gate. | Koramangala, Domlur, MG Road, Shivajinagar, Mekhri Circle, Hebbal, then Bellary Road | 48.5 km from BDA Complex | About 1 h 50 min |
| KIA-7 | Starts at HSR Layout KEB (Sector 2), then Parangipalya Cross, NIFT College, BDA Complex and HSR Layout 14th Main | Koramangala 1st Block, Hosur Road, Shanthinagar, Richmond Circle, Mekhri Circle, Hebbal, then Bellary Road | 48.0 km from BDA Complex | About 1 h 45 min |
| KIA-8 and KIA-8A | Central Silk Board, SI Apartment HSR Layout, Depot-25 Gate, Agara Junction | Outer Ring Road: Bellandur, Marathahalli, KR Puram, Nagawara, then Hebbal and Bellary Road | 55.7 km from SI Apartment | About 1 h 55 min to 2 h 5 min |
| KIA-8C | As KIA-8, plus 14th Main HSR Layout on the Outer Ring Road | Outer Ring Road, as KIA-8 | 55.0 km from 14th Main | About 2 h 15 min |
| KIA-8E | Central Silk Board, SI Apartment, Depot-25 Gate, Agara Junction | Outer Ring Road to KR Puram, then Hennur, Kannur and Bagalur instead of Hebbal | 51.3 km from SI Apartment | About 2 h |
| KIA-8EW | Central Silk Board, SI Apartment, Depot-25 Gate, Agara Junction | Outer Ring Road, then Hebbal | Not published (see note) | About 2 h 5 min |
Source: Vonter/bmtc-gtfs feed of 7 September 2026, compiled from the Namma BMTC app. Route lengths are measured along each route's mapped path in that data, from the HSR Layout stop to the airport stop. Running times are the median of BMTC's own scheduled times for that stretch. KIA-8EW's mapped path is inconsistent with the same roads on KIA-8, so we left its length out.
The choice is between the two corridors. KIA-7A is the route most HSR Layout residents can walk to: it starts at BDA Complex in Sector 6, in the middle of the layout, and it is the shorter bus route at about 48 km. The KIA-8 series runs along the Outer Ring Road, so it suits Sector 1, near Agara Junction, and anyone already on the ORR. It is a longer ride because it goes round through Marathahalli and KR Puram before turning north.
Which bus stop should you walk to for the airport bus?
From most of HSR Layout, BDA Complex is the nearest airport-bus stop, 0.6–0.9 km on foot from Sectors 3, 4, 5, 6 and 7. Sector 6 is closer to SI Apartment on the Outer Ring Road (0.5 km), Sector 1 is closest to Agara Junction (1.0 km), and Sector 2 is closest to the KIA-7 starting stop at HSR Layout KEB (0.8 km).
| From | BDA Complex (KIA-7A, KIA-7) | SI Apartment, ORR (KIA-8 series) | 14th Main, ORR (KIA-8C) | Agara Junction (KIA-8 series) | HSR Layout KEB (KIA-7) |
|---|---|---|---|---|---|
| Sector 1 | 1.61 km | 2.40 km | 1.81 km | 1.04 km | 1.44 km |
| Sector 2 | 1.50 km | 2.86 km | 2.17 km | 2.22 km | 0.76 km |
| Sector 3 | 0.83 km | 2.18 km | 1.58 km | 2.50 km | 1.48 km |
| Sector 4 | 0.59 km | 1.57 km | 0.98 km | 2.03 km | 2.02 km |
| Sector 5 | 0.85 km | 1.13 km | 0.43 km | 2.27 km | 3.03 km |
| Sector 6 | 0.94 km | 0.53 km | 0.91 km | 2.79 km | 3.09 km |
| Sector 7 | 0.64 km | 1.34 km | 1.06 km | 2.79 km | 2.36 km |
| 20th Cross Rd (HSR Stay) | 0.74 km | 1.19 km | 1.15 km | 2.88 km | 2.51 km |
Walking distances on the OpenStreetMap foot network, from each sector's centre to the stop, 17 November 2026. The foot router allows about 13 minutes per kilometre.
Two cautions. Sector 5's nearest stop, 14th Main on the Outer Ring Road, is served only by KIA-8C, so for most departures Sector 5 is better off walking 0.85 km to BDA Complex. Depot-25 Gate, on the Outer Ring Road east of 14th Main in Sector 4, is also served by the whole KIA-8 series and one KIA-7A variant, and it is 0.75 km from Sector 4.
How do you get from the airport to HSR Layout?
Take KIA-7A to its last stop, BDA Complex HSR Layout, or any KIA-8-series bus to SI Apartment, Depot-25 Gate or Agara Junction on the Outer Ring Road. In BMTC's route data, the same routes run in reverse and drop at the same stops. KIA-7 also runs from the airport through BDA Complex, NIFT College and Parangipalya Cross to its terminus at HSR Layout KEB. By road the trip is the same 43–45 km on the shortest route.
If you are arriving with luggage for a long stay, the walk from the bus stop matters more than the bus. HSR Stay's street, 20th Cross Rd in Sector 7, is 0.74 km on foot from BDA Complex, where KIA-7A ends.
How much does the airport bus from HSR Layout cost?
A Vayu Vajra monthly pass costs ₹4,000, at the prices set in BMTC's January 2025 fare revision. It is separate from the ₹2,000 Vajra pass for the city's air-conditioned routes, which does not cover the airport buses. Karnataka's Shakti scheme, which gives women resident in Karnataka free travel on non-AC buses, does not cover Vayu Vajra either, because the airport buses are air-conditioned.
Is there a metro from HSR Layout to the airport?
No, not yet. HSR Layout's own station, on the Blue Line, is still under construction, and the Blue Line's airport section is too. When the whole line is open, it will be a single ride with no change of line: HSR Layout is station 2 of the Blue Line's 29, and KIAL Terminals is station 29, so the airport will be 27 stops from HSR Layout. Agara, the second station serving HSR Layout, will be 26 stops from the airport.
| Blue Line section | Latest reported target | Source |
|---|---|---|
| Central Silk Board – KR Puram (Phase 2A, 19.75 km, 13 stations, including HSR Layout and Agara) | 2027 | Times of India, reported by Swarajya, 16 August 2026 |
| KR Puram – Hebbal (about 11 km, part of Phase 2B) | December 2027, BMRCL's aim | Deccan Herald, 20 August 2026 |
| Hebbal – airport (27.44 km, part of Phase 2B) | Deadline June 2027; "unlikely to open before September 2027" | Deccan Herald, 20 August 2026 |
| Phase 2B as a whole (KR Puram – airport, about 38.4 km, 16 stations) | December 2028 | Wikipedia's Blue Line infobox, as read 17 November 2026 |
The rail trip from HSR Layout needs all three sections open, so on BMRCL's own targets it cannot happen before the end of 2027, and the most conservative figure in circulation is December 2028. If the Hebbal–airport section opens first, as BMRCL has planned, it will not help HSR Layout directly, because no metro line that HSR Layout can reach serves Hebbal. In August 2026 Deccan Herald reported that the contractor had sought until March 2027 to finish the IAF Yelahanka–airport stretch, its third extension, with the section about 80% complete. Every date for the HSR Layout station itself is on our HSR Layout metro station page.
What does the toll and airport pickup cost by car or cab?
A car pays ₹120 one way at the Sadahalli toll plaza on the airport road. That rate was left unchanged in the annual revision that took effect on 1 April 2026, and the revised rates run until 31 March 2027 (News Karnataka, 28 March 2026). National Highways Authority of India officials said further revisions were likely later in 2026, so check before you rely on it.
| Charge | Amount | Set by, and from when |
|---|---|---|
| Sadahalli toll plaza, car, single journey | ₹120 | Annual national-highway toll revision; unchanged from 1 April 2026, valid to 31 March 2027 |
| Arrival pickup zone, private (white-board) car, first 8 minutes | Free | BIAL, from 8 December 2025 |
| Arrival pickup zone, private car, 8–13 minutes | ₹150 | BIAL, from 8 December 2025 |
| Arrival pickup zone, private car, 13–18 minutes | ₹300 | BIAL, from 8 December 2025 |
| Arrival pickup zone, private car, over 18 minutes | Towed to the nearest police station, with fines and towing charges | BIAL, from 8 December 2025 |
| Yellow-board taxis and electric cabs | First 10 minutes free in designated parking: P3 and P4 at Terminal 1, P2 at Terminal 2 | BIAL, from 8 December 2025 |
Pickup rules as announced by Bangalore International Airport Limited (BIAL) and republished by ACI Asia-Pacific on 3 December 2025.
We publish no cab fare for this trip. App-cab prices move with demand and time of day, and the airport's pickup fee for app-based cabs is reported to be passed on to passengers, so any single number would be out of date quickly.
Is HSR Layout a good base if you fly often?
Not if flying is the main thing you do. At 43–45 km by the shortest road and a bus ride of roughly two hours on the schedule, HSR Layout is among the farther parts of Bengaluru from its airport. North Bengaluru, around Hebbal and Yelahanka, is much closer.
HSR Layout makes sense when your working week happens in the south-east. The Electronic City tech parks, the Outer Ring Road offices up to Marathahalli, and Koramangala are all close. In that case the airport run is the one long trip you make each time you fly, not every day. The practical habit is to leave generous slack, and to check whether a KIA-7A or KIA-8 stop is within a short walk before you choose where in HSR Layout to stay. Our guide to HSR Layout's seven sectors compares them on everything else.
Common questions about HSR Layout to the airport
Kempegowda International Airport is 42.5 to 45.2 km by road from HSR Layout on the shortest route, and 32.4 to 33.3 km in a straight line, measured from the centres of HSR Layout's seven sectors to Terminal 1 on OpenStreetMap in November 2026. Sector 5 is closest and Sector 2 furthest. The airport buses cover 48 to 56 km because they take longer routes.
Seven BMTC Vayu Vajra airport routes serve HSR Layout. KIA-7A starts at BDA Complex HSR Layout and runs through Koramangala, MG Road, Shivajinagar and Hebbal. KIA-7 starts at HSR Layout KEB in Sector 2. KIA-8, KIA-8A, KIA-8C, KIA-8E and KIA-8EW pick up on the Outer Ring Road at SI Apartment, Depot-25 Gate and Agara Junction.
For most of HSR Layout the nearest airport-bus stop is BDA Complex HSR Layout in Sector 6, where KIA-7A starts. It is 0.6 to 0.9 km on foot from the centres of Sectors 3, 4, 5, 6 and 7. Sector 6 is also 0.5 km from SI Apartment on the Outer Ring Road, Sector 1 is 1.0 km from Agara Junction, and Sector 2 is 0.8 km from HSR Layout KEB.
BMTC's own scheduled running times from HSR Layout stops to the airport are about 1 hour 45 minutes to 2 hours 15 minutes, depending on the route, in the September 2026 route data compiled from the Namma BMTC app. KIA-7A from BDA Complex is scheduled at about 1 hour 50 minutes. Actual times depend on traffic, and the compiler warns the app's timetables are inaccurate.
No. HSR Layout's station on Namma Metro's Blue Line is still under construction, and so is the line's airport section. When the whole Blue Line opens it will be a single ride with no change: HSR Layout is station 2 of 29 and KIAL Terminals is station 29, so the airport will be 27 stops away.
Not before the end of 2027 on BMRCL's own targets. The trip needs three Blue Line sections: Central Silk Board to KR Puram, reported for 2027; KR Puram to Hebbal, which BMRCL aims to open by December 2027; and Hebbal to the airport, which Deccan Herald reported in August 2026 was unlikely to open before September 2027. Wikipedia gives December 2028 for the whole airport phase.
A car pays 120 rupees one way at the Sadahalli toll plaza on the airport road. The rate was left unchanged in the annual revision effective 1 April 2026, and the revised rates apply until 31 March 2027, according to News Karnataka on 28 March 2026. At the terminals, private cars get 8 free minutes in the arrival pickup zone, then pay 150 rupees up to 13 minutes and 300 rupees up to 18 minutes.
More commute guides
- Commuting from HSR Layout — every destination, the Silk Board flyover and the metro, in one guide.
- Getting around HSR Layout without a car — where the buses stop, bus passes, metro tickets, auto fares and bike taxis.
- HSR Layout to Whitefield — measured distances from every sector and the metro trip via KR Pura.
- HSR Layout metro station — the Blue Line, all 13 Phase 2A stations in order, and every opening date in circulation.
Moving to Bengaluru for a job? Start with relocating to Bangalore: the first 30 days.
Flying in for a long stay?
HSR Stay is a serviced-apartment property opening in HSR Layout, Sector 7, in December 2026 — fully furnished 1 BHK and 2 BHK apartments built for business travellers, relocating professionals and long stays, 0.74 km on foot from the KIA-7A airport bus at BDA Complex. We are taking enquiries now.
Enquire on WhatsApp